Monday 26 August 2013

bit by bit

Got another 15 ft planked on obe,  long process as the bridging always has to be elevated.   Yan and i dug around in the rooty swamp mess,  place some rocks down and raise the bridge above the muck.   Otherwise there would be some horrible  rot happening pretty quick.  As well, whoever repaired the wallride thanks so much!   You did a great job,  really appreciate the help.

3 comments:

  1. thnx, hopefully can get obe done in the next week or so then start thinking about other lines

    ReplyDelete
  2. Great job the trail is super fun

    ReplyDelete